Tergus Pharma required a number of flooring solutions for their Durham, NC facility: polished concrete in the Break Room, densified concrete with full-depth control joint fill in the Warehouse, and General Polymers FasTop urethane slurry system in their 35,000 square feet Manufacturing areas. ACC also installed over 1 mile of integral cove base including custom formed exterior corners for each column throughout the facility.